futarisIRCcloud has quit [Quit: Connection closed for inactivity]
Getorix has joined #glasgow
Getorix_ has quit [Ping timeout: 265 seconds]
ali_as has quit [Ping timeout: 256 seconds]
ExeciN has joined #glasgow
ali_as has joined #glasgow
futarisIRCcloud has joined #glasgow
ExeciN has quit [Ping timeout: 256 seconds]
ec0 has quit [Ping timeout: 264 seconds]
ec0 has joined #glasgow
<awygle>
what was the name of that person that was optimizing the glasgow bom for cost?
<awygle>
and the pcb layout under a different name?
<awygle>
trying to find the discussions in the logs...
<awygle>
ah, niklas
<awygle>
so what's the current glasgow status
<awygle>
are we solely blocked on esden's time? or are there more design changes to go in?
<esden>
I need to make some changes to the design. For manufacturing. Then order pogo pin testers. And a few more things. I just finished restocking my store and am back on the Glasgow train as of today.
<esden>
I explained a bunch of that on my last Glasgow stream
<esden>
If you are interested
<esden>
I am integrating some of niklas changes
<esden>
Not all though
<esden>
As they were lcsc specific
<awygle>
mhm
<esden>
I will send you the WIP branch when I push it
<awygle>
i don't really want to ask this question but doy ou have a timeline for the crowdsupply campaign?
<awygle>
i am evaluating having somebody like pcbway just build me a few to have because i have a semi-acute need for one
<esden>
I can send you one
<awygle>
o
<awygle>
i spose that'd work lol
<esden>
Dm me :)
<esden>
I know you will do stuff on it that the prototype boards are meant for and you are close by too ;)
<awygle>
am i? i thought you were in the EU for some reason, oops
<esden>
I am in Eugene, OR :D
<esden>
But 1b2 has a base also in Germany.
<esden>
I think we talked at Latch UP last time right?
<awygle>
We did yeah
<awygle>
In the Before Times
<esden>
feels like decades ago :D
<electronic_eel>
janhenrik_: did you and niklas finish the bom and dfm optimized "Edinburgh" version?